FTTx · Route · Constructability
Design evidence
- Inputs
- Demand, architecture, route authority, survey, existing assets, design rules and target handover schema.
- Controls
- Assumption register, design reviews, quantity reconciliation, change status and acceptance gates.
- Handover
- Approved geometry, connectivity, drawings, quantities, source register and unresolved constraints.
